02 — Operations

Operations

Process, automation and tooling, told as problem, approach and result. Names and internals are kept generic on purpose.

ERP migration: data and testing

Shipped

Problem
Two legacy SAP instances for Spain and Portugal had to move to S/4HANA with clean master data, and open orders and quotations had to survive the cutover.
Approach
Owned the Iberia master data and testing workstream: cleanup and de-duplication, cutover of open orders and quotations, checks after go-live, with roughly 10–30 people across business, global IT and partners. Tested and signed off the EDI flows and the dealer extranet link.
Result
Go-live in January 2024, with EDI and the dealer extranet signed off before cutover.
  • SAP S/4HANA
  • EDI
  • UAT
  • Cutover

Service-desk programme

In progress

Problem
A logistics client's service desk routed too much work through generic tickets, and requests bounced between groups.
Approach
Audited the request templates read-only through the REST API, replaced generic tickets with a quick-close template, and designed roster-based auto-assignment (specialty first, then workload). Rule: automate a redirect only when bounce-backs stay under 10%.
Result
Auto-assignment validated in shadow mode with pilot groups; a leaner service catalogue after merging portals; load and SLA dashboards for team leads.
  • ServiceDesk Plus
  • REST API
  • SLA dashboards

Billing portal migration

Shipped

Problem
Field-technician billing ran on a Node.js and Google Sheets tool with manual weekly steps and mixed market data.
Approach
Moved it to Zoho Creator, de-duplicated the historical order records, separated data per market with role-based access, and added a Portuguese service order form and a postal-code lookup.
Result
About 2 hours a week saved for each user.
  • Zoho Creator
  • Deluge
  • Node.js
  • Google Sheets

SuperUser calendar flows

Shipped

Problem
The two flows behind a global super-user calendar had blocking defects.
Approach
Reworked both Power Automate flows and their SharePoint triggers.
Result
Six blocking defects fixed.
  • Power Automate
  • SharePoint
  • Power BI

Returns workflow and training

Shipped

Problem
Return workflows needed manual steps, and escalations with key accounts were slowing deliveries.
Approach
Configured SAP workflow to remove manual steps, worked escalations with key account managers, and wrote internal courses and guides as part of a global product expert group.
Result
Fewer manual steps in returns, shorter delivery delays, and colleagues trained live.
  • SAP workflow
  • Training
  • Key accounts